Got back from Oshkosh and started work on the wing.

2005-07-28-180 Fabricated the flap gap stiffeners and installed the gap fairings on the right and left wing

Fabricated the flap gap stiffeners and installed the gap fairings on the right and left wing

2005-07-28-181

2005-07-28-182

2005-07-28-183 Aileron bellcrank installed.  The brass bushing needed to be reamed to 1/4

Aileron bellcrank installed. The brass bushing needed to be reamed to 1/4" so the AN-4 bolt would slide into the bushing

2005-07-28-184 Fabricated the forward and aft torque tube subassemblies.  A pushrod end (VA-162) was missing.  Vans will be sending one out.

Fabricated the forward and aft torque tube subassemblies. A pushrod end (VA-162) was missing. Vans will be sending one out.

2005-07-28-185 Bellcrank to pushrod fabricated

Bellcrank to pushrod fabricated

2005-07-28-186 Torque tube to bellcrank pushrods fabricated and threaded rod end installed.  The scotchbrite wheel need to be used on the rod end to allow it to inserted into the pushrod.

Torque tube to bellcrank pushrods fabricated and threaded rod end installed. The scotchbrite wheel need to be used on the rod end to allow it to inserted into the pushrod.

2005-07-28-187

2005-07-28-188 Aleron bellcrank installed in the right wing.

Aleron bellcrank installed in the right wing.

2005-08-02-197

2005-08-02-198

2005-08-06-209 Cracked the gap fairing while trying to set the rivet

Cracked the gap fairing while trying to set the rivet

2005-08-08-212

2005-12-10_RV10-020 Doubler for the repair

Doubler for the repair

2005-12-10_RV10-019 Ground out the cracked material

Ground out the cracked material