RV-10 Construction » Construction Log » Fuselage & Finishing Kit
Currently working on the canopy and wiring (January 2007).
Inventory
| Total images: 6
Inventory of the Quickbuild fuselage
Finish & FWF Kits Arrive
| Total images: 23
The finishing kit and FWF kit ordered December 2005 and arrive March 10, 2006.
Com Antenna Doubler
| Total images: 14
Com antenna doubler installed under the rear seats. I am using 2 Comant CI-122 VHF antennas
Front Floors
| Total images: 17
Installation of the front floor boards, sound proofing, and installation of landing gear bracket.
Rear Seats
| Total images: 8
Rear seat fabrication
Baggage Door
| Total images: 10
Fabrication of the Baggage Door
Floor Access Panels
| Total images: 34
Added access panels to the passanger seat and baggage compartment floor
Interior Paint and Finish
| Total images: 8
Painted the interior with RM UNO-HD. The paint code is 9112A 225306. It is a satin light gray. The flattner is already in the mix. It is compatible with the Akzo Nobel primer.
Cabin Top
| Total images: 26
Lots of fiberglass work
ELT
| Total images: 6
AmeriKing AK-450 ELT mounted to the right side wall in the tail cone.
Static
| Total images: 2
SafeAir Pitot Static Port Installation
Transponder
| Total images: 6
Transponder antenna is installed in the floor of the tunnel