RV-10 N205EN

Up one level RV-10 Construction » Construction Log » Fuselage & Finishing Kit » Fuselage Wiring

Fuselage Wiring
Starting to wire the fuselage

2006-01-22-RV10-06

2006-01-22-RV10-07

2006-01-22-RV10-13

2006-01-22-RV10-14

2006-01-22-RV10-15

2006-01-22-RV10-17

2006-12-20-378 Sliding switch for rear overhead light.  It will be connected to the battery bus.  Located rear of the baggage door.

Sliding switch for rear overhead light. It will be connected to the battery bus. Located rear of the baggage door.

2006-12-20-379 Switch doubler

Switch doubler

2006-12-20-380

2006-12-20-381

2006-12-20-382

2006-12-20-383

2006-12-22-390 Fat wire

Fat wire

2006-12-22-391

2006-12-27-427 Wire guide to keep the wire from the step.  Also notice the large hole to the left required to remove the step bolt.

Wire guide to keep the wire from the step. Also notice the large hole to the left required to remove the step bolt.

2006-12-30-437

2006-12-30-438

2006-12-30-439

2006-12-30-440

2006-12-30-441

2007-01-06-457

2007-01-06-458

2007-01-06-459