RV-10 Construction » Construction Log » Empennage
The 14 day builders assistance program at the
Alexander Technical Center . I completed the Empennage kit. The only tasks left to complete are Section 11: Empennage Attach and Section 12: Empennage Fairings. The program will easily save 6 to 9 months of building.
Empennage Attach and Empennage Fairings
| Total images: 13
Empennage Attach and Empennage Fairings. These steps weren not completed during the Quickbuild program. Empennage attach is completed. I will wait to complete the tips when I do the wing tips. The emp is now disassembled with the shop ready for delivery of the QB wings and fuselage.