RV-10 N205EN

Up one level RV-10 Construction » Construction Log » Empennage » Alexander Technical Center Quickbuild Program » Day 13 (May 4, 2005)

Day 13 (May 4, 2005)


P5040086 side skins clecoed in place.  Getting ready for more riveting.

side skins clecoed in place. Getting ready for more riveting.

P5040087 Side skin clecoed in place.

Side skin clecoed in place.

P5040088 The third view.

The third view.

P5040089 Another view.

Another view.

P5040090 Another view.

Another view.

P5040091 Riveting the side skin.  The tail cone was fliped over to make bucking easier.  Frames first.

Riveting the side skin. The tail cone was fliped over to make bucking easier. Frames first.

P5040092 Riveting

Riveting

P5040093 Riveting the rear of the tail cone was the most difficult and took the longest.

Riveting the rear of the tail cone was the most difficult and took the longest.

P5040094 Jacob bucking rivets.

Jacob bucking rivets.

P5040095 Most of the riveting completed.

Most of the riveting completed.

P5040096

P5040097 Riveting the rear of the tail cone.

Riveting the rear of the tail cone.