RV-10 N205EN

Up one level RV-10 Construction » Construction Log » Empennage » Alexander Technical Center Quickbuild Program » Day 11 (May 2, 2005)

Day 11 (May 2, 2005)


P5020060 Tail cone top skins in place.

Tail cone top skins in place.

P5020061 Top skins in place.

Top skins in place.

P5020062

P5020065 A couple of clecos ;-)

A couple of clecos ;-)

P5020066 After the top skins are in place the rear longeron can be match drilled.

After the top skins are in place the rear longeron can be match drilled.

P5020067

P5020068 Jacob autographing the rudder.

Jacob autographing the rudder.

P5020069 Now I am signing

Now I am signing

P5020072 The final rolled product with flush pop rivets.

The final rolled product with flush pop rivets.

P5020071 Mike autographing the rudder.

Mike autographing the rudder.