RV-10 N205EN

Up one level RV-10 Construction » Construction Log » Empennage » Alexander Technical Center Quickbuild Program » Day 4 (April 25, 2005)

Day 4 (April 25, 2005)


P4250075 And working on the elevators

And working on the elevators

P4250076 Elevators ready for final drilling

Elevators ready for final drilling

P4250077 Drilling some holes

Drilling some holes

P4250078 more drilling

more drilling

P4250079 more drilling

more drilling

P4250080 These are only spot welded by Van's.  The quality could be better.  They will be welded up to improve the streingth

These are only spot welded by Van's. The quality could be better. They will be welded up to improve the streingth

P4250081 Need to drill some holes.  Make sure you maintain the required rivet edge distance.

Need to drill some holes. Make sure you maintain the required rivet edge distance.